Click the card to flip it 👇
What is the focus of the Indoor Environmental Quality category?
Enhancing air, light, comfort, acoustics, and overall occupant well-being
What are the three EQ prerequisites?
EQp1 Construction Management, EQp2 Fundamental Air Quality, EQp3 No Smoking
What are the point values of the five EQ credits?
Enhanced Air Quality 2, Occupant Experience 7, Accessibility and Inclusion 2, Resilient Spaces 3, Air Quality Testing and Monitoring 4
What is a regularly occupied space?
A space where people spend more than 1 hour per day (e.g., office, classroom)
What is a non-regularly occupied space?
A space used less than 1 hour per day or passed through (e.g., corridor, copy room)
What is an unoccupied space?
A space not meant for regular human activity (e.g., mechanical room, storage)
What is the intent of EQp1 Construction Management?
Reduce indoor environmental quality issues during construction
How far from the building must construction smoking areas be?
What does HVAC protection require under EQp1 Construction Management?
Keep contaminants out, replace all filters before occupancy, and complete testing and balancing with new filters
What does source control require under EQp1 Construction Management?
Protect stored absorptive materials (carpet, ceiling panels, insulation, furnishings) from contaminants and moisture
For all 500 cards, get the full deck:
500 LEED AP ID+C Flashcards
- 500 LEED AP ID+C v5 flashcards
- Digital and printable PDF
- Study on the go on any device
- On-demand instructor support
- 12-month access
Get access ›