0 of 100 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
You must sign in or sign up to start the quiz.
You must first complete the following:
Quiz complete. Results are being recorded.
0 of 100 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0 )
Earned Point(s): 0 of 0 , (0 )
0 Essay(s) Pending (Possible Point(s): 0 )
More questions won’t help yet, your score usually means gaps in the material, not exam technique. Learn it first, then come back and retake this.
Start the LEED AP BD+C course →
You can retake this exam, free, unlimited.
Question 1 of 100
What is the showerhead maximum under WEp2 Prescriptive?
Question 2 of 100
Which requirement is part of EAp5 Fundamental Refrigerant Management Option 2 Refrigerants?
Question 3 of 100
A site has athletic fields within disturbed areas. How are they treated for SSc1 Biodiverse Habitat Option 1 calculations?
Question 4 of 100
Under EAp3 Fundamental Commissioning, which commissioning provider engagement timing is required?
Question 5 of 100
To protect soils for habitat restoration, the contractor should do all the following EXCEPT:
Question 6 of 100
Fundamental Air Quality for healthcare facilities references which ventilation standard?
Question 7 of 100
A parcel includes mapped habitat for a listed species. What’s the most appropriate siting decision?
Question 8 of 100
An office has 780 regular occupants and expects 1,200 peak visitors. Determine the total bicycle parking program.
Question 9 of 100
To protect soils for habitat restoration, the contractor should do all the following EXCEPT:
Question 10 of 100
Open offices add continuous monitoring for CO₂, PM2.5, and TVOCs with alarms to the BAS. What closes the loop?
Question 11 of 100
A design includes multiple chillers using R-410A, which has a global warming potential of 800. What does the fundamental refrigerant management prerequisite require?
Question 12 of 100
A project pursuing LTc3 Access to Transit is 0.26 miles [0.42 km] from a bus stop and 0.48 miles [0.77 km] from a rail station. Which service is within the allowable walking distance?
Question 13 of 100
A civil engineer is sizing detention for a mixed-use site. Under SSc3 Rainwater Management, a storm drops 1.5 inches of rain on 120,000 sq ft of impervious roof and paving with a runoff coefficient of 0.90. What runoff volume must be retained on site to meet the credit’s retain-runoff approach?
Question 14 of 100
A commercial garage will pursue the higher EV charging threshold (EVSE installed) for 2 points. With 260 parking spaces, how many EVSE spaces are required?
Question 15 of 100
An HVAC system is commissioned and shows energy use 12% better than baseline modeling. What ongoing strategy helps ensure sustained performance?
Question 16 of 100
A team selects HVAC equipment to earn the low-GWP refrigerant path. Which target secures the higher point value?
Question 17 of 100
A school chooses displacement ventilation for classrooms to improve both comfort and energy use. Which companion move most strengthens the strategy’s effectiveness?
Question 18 of 100
A district energy plan adds thermal storage for night charging and day discharge. Which grid objective is most directly addressed?
Question 19 of 100
A district contract supplies certified renewable electricity for most loads. What condition allows combining it with rooftop PV for a single total?
Question 20 of 100
The team wants to earn credit for resilient interior spaces during smoke events. Which approach is most aligned?
Question 21 of 100
A submittal lists envelope testing as ASTM E783 for air leakage, ASTM E1105 for water penetration, and infrared imaging per ASTM C1153. Which statement is correct?
Question 22 of 100
Makeup water analysis for a cooling tower shows Ca 300 ppm, total alkalinity 200 ppm, silica 100 ppm, chloride 150 ppm, conductivity 1,100 μS/cm. What is the maximum number of cycles allowed?
Question 23 of 100
A project has 160 regular occupants. How many on-site showers with changing facilities are needed?
Question 24 of 100
Enhanced Water Efficiency (WEc2), Option 6: Water Reuse
To earn 2 points, which path must the project pursue?
Question 25 of 100
Equitable Development (LTc2), Option 1: Priority Sites.
Locating the project in a locally designated historic district earns:
Question 26 of 100
How many points are available for Enhanced Water Efficiency under Water Efficiency
Question 27 of 100
For Fundamental Air Quality, what is the minimum efficiency reporting value required for central HVAC filters when using MERV
Question 28 of 100
For Quantify and Assess Embodied Carbon, what scope must be reported for each material, and what follow-up action is required?
Question 29 of 100
A plaza retrofit must earn Heat Island Reduction with limited budget. Which single measure most directly satisfies the nonroof path for a large paved area?
Question 30 of 100
A university is prioritizing materials with transparent and optimized attributes. Which procurement approach best maximizes compliant value under the multi-attribute method?
Question 31 of 100
A restaurant fit-out installs new pre-rinse spray valves in the dish pit. What is the maximum flow rate under the minimum water efficiency prerequisite?
Question 32 of 100
A construction team diverts 80% of site waste and reuses excavated soil on-site. What additional documentation is required for compliance?
Question 33 of 100
Which task belongs to enhanced commissioning rather than the fundamental prerequisite?
Question 34 of 100
An office tower design aims to reduce embodied carbon in the structure. Which action most effectively supports this goal?
Question 35 of 100
For ingredient strategies, which choice advances optimization beyond simple disclosure?
Question 36 of 100
A project documents 9 qualifying uses within 0.5 miles and a Walk Score in the 70–79 band. How many points?
Question 37 of 100
How many points are available for Enhanced Commissioning under Energy and Atmosphere?
Question 38 of 100
During construction, which meetings must the fundamental commissioning provider attend?
Question 39 of 100
For Enhanced Refrigerant Management, which options are available (choose 2)
Question 40 of 100
A conference center has 460 regular building occupants and expects 800 peak visitors. Determine the bicycle parking program.
Question 41 of 100
A project near a river preserves 60% of existing trees and adds bioswales along the parking edges. Which two environmental outcomes are primarily improved?
Question 42 of 100
Main entry is 0.25 miles from qualifying routes providing 200 weekday trips and 120 weekend trips. Does this meet the minimum transit service requirement?
Question 43 of 100
Devices installed for the energy metering and reporting prerequisite must be capable of recording data at what interval?
Question 44 of 100
A project team wants to align commissioning with post-occupancy performance. What should the team plan for?
Question 45 of 100
A project integrates passive downdraft cooling shafts in a dry climate. What must the team verify to ensure effectiveness?
Question 46 of 100
Nighttime site lighting is redesigned during bird migration seasons. Which change best reduces collision risk?
Question 47 of 100
A project owns 320 off street parking spaces on site, leases 120 spaces in a nearby garage, and subsidizes 60 spaces for a contractor lot. To meet Heat Island Reduction, Parking Under Cover, how many total stalls must be counted in the denominator when determining 100 percent under cover compliance?
Question 48 of 100
An energy model shows that reducing window to wall ratio, improving glazing U-factor, and adding exterior shading decreases annual HVAC energy by 9 percent. Which Energy and Atmosphere credit does this annual savings directly target?
Question 49 of 100
A mixed-use project has an office with 600 regular occupants and 400 peak visitors, plus retail with 100 regular occupants and 800 peak visitors. Calculate the required long-term and short-term bicycle spaces.
Question 50 of 100
To prevent interzone pollutant transfer near copy and janitor rooms, the design should (choose 2):
Question 51 of 100
In a low brightness zone, a site lighting design limits uplight and shields luminaires at property lines, what is the primary performance objective?
Question 52 of 100
Construction waste totals 600 tons. The project salvages 120 tons, recycles 180 tons in separate streams, and sends 150 tons of commingled material to a facility without third-party verification. What is the diversion percentage?
Question 53 of 100
A site boundary is 46 feet (14 meters) from a mapped wetland edge, will the design meet Sensitive Land Protection if no work occurs inside the buffer?
Question 54 of 100
Which action does NOT contribute to interior lighting quality?
Question 55 of 100
A coastal project is designing for flood risk. Which strategy most directly supports resilient site design?
Question 56 of 100
A nonresidential project has 560 regular building occupants. To comply with Path 2 (Showers & Changing), how many on-site or qualifying off-site showers must be provided at minimum?
Question 57 of 100
A site plan shows a protected bike lane running from a building entrance directly to multiple nearby destinations and transit, with no gaps at intersections. Which feature most strengthens the bicycle network credit outcome?
Question 58 of 100
A commercial project has 180 total parking spaces. The team pursues Option 1 (EVSE) at the 2-point level and Option 2 (EV-ready). What is the minimum number of distinct spaces that must be designed across both options?
Question 59 of 100
Which three systems/elements must be included in commissioning? (Choose 3)
Question 60 of 100
A project registers on February 1, 2029. Which standard must it use to comply with Minimum Energy Efficiency?
Question 61 of 100
An interiors package includes natural stone flooring and salvaged wood paneling in use for over a year. How are these treated under the low-emitting materials credit?
Question 62 of 100
A project achieves 50% whole-project water-use reduction and implements alternative water sources. How many points?
Question 63 of 100
A building is setting up Energy Metering and Reporting. Which commitment is required for data sharing?
Question 64 of 100
Which three are required for Leak Detection Sensors? (Choose 3)
Question 65 of 100
A building-mounted luminaire is installed 1.5 mounting heights from the lighting boundary in MLO Lighting Zone LZ3, oriented per requirements. Which maximum ratings are allowed?
Question 66 of 100
An all-electric office targets Electrification, Option 1. What minimum combined weighted average equipment efficiency must space heating and service water heating achieve?
Question 67 of 100
A contract transfers the environmental attributes of purchased renewable electricity to a third party. Is the purchase eligible under the renewable energy credit?
Question 68 of 100
A distribution center is pursuing EQc5 Air Quality Testing and Monitoring Option 1 Preoccupancy Air Testing. The occupied floor area is 120,000 square feet. How many measurement locations are required?
Question 69 of 100
Within the analysis radius, occupied floor area totals 3,000,000 ft² over 600,000 ft² of buildable land. What density value applies?
Question 70 of 100
residential tower allows smoking in dwelling units and is documenting enclosure performance for EQp3 No Smoking or Vehicle Idling. The conditioned floor area is 80,000 square feet [7,432 square meters] and the pressure test for new construction is at 50 Pascals. What is the maximum allowable air leakage?
Question 71 of 100
Option 2: MBCx, Energy Information System (EIS) (Choose 3) Which features are required for the EIS?
Question 72 of 100
A design team drafts a plan for Planning for Zero Waste Operations that includes commingled recycling for paper, cardboard, glass, plastics, and metals. Which required element must be added to comply with the prerequisite?
Question 73 of 100
A pendant luminaire is measured at UGR = 18 and TM-30 values Rf = 79, Rg = 96, Rcs,h1 = +6%. Does it meet both glare and color criteria?
Question 74 of 100
For Occupant Experience, Path 2 Quality Views, which condition earns 2 points?
Question 75 of 100
Your water efficiency model shows a 65 percent indoor water reduction, well above the 60 percent threshold in that credit. When mapped under PRc1 Project Priorities, which label best describes this achievement?
Question 76 of 100
Which three count toward the list of 10 features in the credit Accessibility & Inclusion (EQc3) ? (Choose 3)
Question 77 of 100
Site lighting at the boundary uses luminaires with low uplight and controlled backlight per the BUG system. What result is most likely at the property line?
Question 78 of 100
A project on a previously disturbed site pursues Biodiverse Habitat, Option 1 Preserve and Restore Habitat, Path 2. If the team restores 20 percent of the previously disturbed area, how many points are earned?
Question 79 of 100
A lab pursuing EA EAp4 Energy Metering and Reporting wants to trend chilled water plant electricity and exterior lighting separately. What should be installed?
Question 80 of 100
Which inspection plan aligns with the site disturbance prerequisite?
Question 81 of 100
A fit-out under EQc5 Air Quality Testing and Monitoring Option 1 Preoccupancy has 52,000 square feet [4,831 m2] of occupied area. How many test locations are required?
Question 82 of 100
When calculating required outdoor air, which variable has the greatest influence?
Question 83 of 100
A project plans public-facing ground-floor amenities. Which strategy best supports equitable development goals?
Question 84 of 100
A product’s environmental declaration lists impacts only through manufacturing. What boundary scope does this represent?
Question 85 of 100
A contractor dewaters an excavation to the storm system for two weeks. How often must the erosion and sedimentation controls at the discharge be inspected?
Question 86 of 100
A storm drops 1.2 inches of rain on 90,000 square feet of impervious surface with a runoff coefficient of 0.85. What runoff volume must be retained on site under the retain-runoff approach?
Question 87 of 100
A project team asks what analysis they must produce for the 25-year Carbon Assessment. What is required from the team to comply?
Question 88 of 100
To meet pre-occupancy testing, which statement is accurate about sampling?
Question 89 of 100
For EQp1 Construction Management scheduling, what action reduces IAQ risk where adjacent clinics remain open?
Question 90 of 100
When calculating nonresidential density in the compact and connected development credit, which mapping rule applies?
Question 91 of 100
Why is a system-by-system refrigerant inventory required?
Question 92 of 100
Which exclusion can be applied to the weighted COP calculation under EAc1 Electrification?
Question 93 of 100
A garage installs both EV-ready and EVSE spaces. What is correct for counting?
Question 94 of 100
The team is shortlisting hazards. Which pair best fits required “natural hazards” for study over the service life?
Question 95 of 100
A 4.5-acre site has 1.2 acres of greenfield. Under SSc1 Biodiverse Habitat Option 1 Path 1, what minimum area must be protected from disturbance?
Question 96 of 100
A project with conventional setbacks retains the 80th percentile rainfall volume and reuses part of it for irrigation. What does the rainwater management credit award in total?
Question 97 of 100
Under EAc3 Option 2 Energy Simulation, which energy basis replaces cost?
Question 98 of 100
An owner wants analytics to keep performance on track. Which capability is essential for the fault detection and diagnostics platform?
Question 99 of 100
Per EAp3 Fundamental Commissioning, what sampling requirement applies to contractor documentation?
Question 100 of 100
Alongside installing leak detection sensors, what must the project develop to earn the water leak detection option?