What peak load intensity must new construction projects meet for 1 point in Reduce Peak Thermal Loads?
16 Btu/h per sq. ft. (50 W/sq. m.).
What peak load intensity must new construction projects meet for 3 points in Reduce Peak Thermal Loads?
8 Btu/h per sq. ft. (25 W/sq. m.).
What percent envelope load improvement is required for 2 points under ASHRAE 90.1 trade-off methods?
What percentage improvement earns 3 points using Energy Simulation in Reduce Peak Thermal Loads?
Performance index of 0.3.
How many points are available for Enhanced Energy Efficiency?
What percentage reduction earns 10 points under Energy Simulation in Enhanced Energy Efficiency?
What contract length is required for off-site renewable energy under Renewable Energy credit?
10 years or prorated across 10 years.
What solar readiness requirement must the solar zone area meet?
At least 40% of the gross roof area.
What is the minimum solar zone area required?
160 sq. ft., with no part less than 5 feet wide.
What ASTM standard applies to building enclosure commissioning under Enhanced Commissioning?
For all 500 cards, get the full deck:
500 LEED AP BD+C Flashcards
- 500 LEED AP BD+C v5 flashcards
- Digital and printable PDF
- Study on the go on any device
- On-demand instructor support
- 12-month access
Get access ›