Click the card to flip it 👇
Must tenants have access to meter data?
Yes, tenants must be able to access the meter data.
What water sources must be reported in WEp1?
All potable and alternative water sources within project scope.
Are meters required for systems outside the project scope?
No, meters are only required for systems in the project scope.
What is the reporting frequency required by WEp1?
Annual reporting to USGBC.
What is the maximum flush rate for toilets under WEp2 Prescriptive Path?
What is the maximum flush rate for urinals under WEp2 Prescriptive Path?
What is the maximum flow rate for public lavatory faucets under WEp2?
What is the maximum flow rate for private lavatory faucets under WEp2?
What is the maximum flow rate for kitchen faucets under WEp2?
What is the maximum flow rate for showerheads under WEp2?
For all 500 cards, get the full deck:
500 LEED AP BD+C Flashcards
- 500 LEED AP BD+C v5 flashcards
- Digital and printable PDF
- Study on the go on any device
- On-demand instructor support
- 12-month access
Get access ›