Which ASHRAE 90.1 version can projects registered before January 1, 2028 use?
ASHRAE 90.1-2019 (or 90.1-2022).
Which ASHRAE standard is required for projects registered after Jan 1, 2028?
What does the building envelope backstop ensure?
A minimum envelope performance level (walls, roofs, windows, insulation), required under Option 1 for projects using ECB or PRM.
What is the average site energy savings of ASHRAE 90.1-2022 compared to 2019?
14% average site energy savings.
What systems must be commissioned under EAp3?
Building envelope, HVAC, service water heating, power, lighting, on-site renewables, energy monitoring, refrigeration, energy storage, and load management.
What experience must the commissioning provider have?
Commissioning experience on at least 2 projects.
What percentage of contractor documentation must be sampled under EAp3?
At what stages must the commissioning provider attend meetings?
At 50% and 100% completion.
At what intervals must energy devices record data under EAp4?
For how many years must energy data be reported to USGBC under EAp4?
At least annually, for 5 years.
For all 500 cards, get the full deck:
500 LEED AP BD+C Flashcards
- 500 LEED AP BD+C v5 flashcards
- Digital and printable PDF
- Study on the go on any device
- On-demand instructor support
- 12-month access
Get access ›
Trusted by 7,000+ students