0 of 30 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
You must sign in or sign up to start the quiz.
You must first complete the following:
Quiz complete. Results are being recorded.
0 of 30 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0 )
Earned Point(s): 0 of 0 , (0 )
0 Essay(s) Pending (Possible Point(s): 0 )
More questions won’t help yet, your score usually means gaps in the material, not exam technique. Learn it first, then come back and retake this.
Start the LEED AP O+M course →
You can retake this exam, free, unlimited.
Show Question
1
Show Question
2
Show Question
3
Show Question
4
Show Question
5
Show Question
6
Show Question
7
Show Question
8
Show Question
9
Show Question
10
Show Question
11
Show Question
12
Show Question
13
Show Question
14
Show Question
15
Show Question
16
Show Question
17
Show Question
18
Show Question
19
Show Question
20
Show Question
21
Show Question
22
Show Question
23
Show Question
24
Show Question
25
Show Question
26
Show Question
27
Show Question
28
Show Question
29
Show Question
30
Review
Answered
Correct
Incorrect
Question 1 of 30
A mixed-use facility has installed the following meters:
Municipal potable water meter (whole building)
Rainwater harvesting system meter
Cooling tower submeter
Tenant-level submeters (not accessible to facility manager)
Data recorded for 10 months
Which of the following issues would prevent compliance with WEp1, Water Metering and Reporting?
Question 2 of 30
A 40-space commercial parking garage is adding EV charging for a LEED O+M project. The owner wants the smallest compliant package, but one of the EVSE stalls also needs to be accessible for people with mobility, ambulatory, and visual limitations. Which proposal works?
Question 3 of 30
A building has no refrigerant-based equipment and does not create a refrigerant management policy. What is true?
Question 4 of 30
A project uses high-reflectance roofing but covers only 30% of roof area. Which is true?
Question 5 of 30
A project purchases renewable energy from an off-site wind farm. Which of the following is NOT compliant with Tier 3 requirements?
Question 6 of 30
A project is developing Management Mode for Respiratory Diseases under Resilient Spaces. Which standard must it follow?
Question 7 of 30
A team is trying to document Renewable Energy, Tier 3. Which setup fails the requirement?
Question 8 of 30
A retail project apply for Enhanced MBCx and fault detection/ diagnostics (FDD) on a 8,300 kBtu/hr system, which item is not required?
Question 9 of 30
How many prerequisites are there in the Materials and Resources category in O+M?
Question 10 of 30
For the Exterior Lighting strategy in SSc2: Light pollution reduction and bird collision reduction, when should all nonessential exterior fixtures be turned off?
Question 11 of 30
A grocery-anchored retail project is 27,000 sq ft (2,508 sqm). During the 12-month reporting period, it uses 243,000 gal/yr of potable water. Under Water Efficiency Performance (WEc1), how many points does it earn?
Question 12 of 30
A project achieves a 36% diversion rate. How many points does this correspond to in Waste Reduction Performance?
Question 13 of 30
Which two project setups satisfy LTc2: Transportation Demand Management, Shared Mobility Options? (choose 2)
Question 14 of 30
In EQc3 Occupant Experience Performance, which two survey requirements must be met ? (choose 2)
Question 15 of 30
When performing the Climate Resilience Assessment for IPp1, how many natural hazards must the project team identify at a minimum?
Question 16 of 30
When calculating Source Energy Use Intensity for EAp3: Minimum Energy Performance, which conversion factor statement is NOT correct?
Question 17 of 30
A U.S. office building achieves an ENERGY STAR® score of 79. How many points will it earn under EAc2: Optimized Energy Performance (Option 1)?
Question 18 of 30
A facility is establishing protocols for Advanced Water Metering WEc2. Which of the following actions is NOT required to maintain credit compliance?
Question 19 of 30
Under the Project Priority library options, which of the following is NOT an accurate description of a strategy?
Question 20 of 30
A commercial project with 1,000 regular occupants attempts LTc2 Transportation Demand Management Option 2: Shared Mobility Options. Which of the following deployments successfully satisfies all conditions without failing thresholds?
Question 21 of 30
In EQc7 Green Cleaning, which two options meet the janitorial paper requirement? (choose 2)
Question 22 of 30
Under EAc7 Commissioning Option 2 Path 2 Enhanced MBCx, which load is specifically required to be metered and visualized hourly?
Question 23 of 30
A facility already has a composting stream and wants to add yard trimmings as a new stream. Which option can still apply?
Question 24 of 30
A project team is reviewing their carbon projection results. They notice that electricity emissions decrease significantly over the 25-year projection, but emissions from natural gas remain flat.
The owner questions the results, arguing that all emissions should decrease over time as energy systems improve.
Question 25 of 30
A commercial office building employs 120 full-time staff. The safety program includes onboarding training, hazard communication, and annual refreshers. However, no staff member has received CPR, first aid, or AED training.
What is the compliance status?
Question 26 of 30
A facility generates 10,000 kg of waste.
Recycled: 2,000 kg
Composted: 1,000 kg
Reused: 500 kg
Asbestos insulation: 150kg
What is the diversion rate?
Question 27 of 30
A project team is documenting EAp1 Carbon Projection from Energy Use. Which of the following is NOT required?
Question 28 of 30
Which is NOT required under Option 2: Waste Management and Education?
Question 29 of 30
A project has 400 regular occupants. A survey receives 80 valid responses. Of those respondents, 18 drive alone, 22 carpool, 20 use public transit, and 20 walk. How many points does the project earn?
Question 30 of 30
A 212,000 sq ft (19,695 sqm) hospital project includes a sustainability consultant with LEED AP O+M credentials who actively participates in operations planning. What benefit can the project claim?