LEED V5 Explained: What Changed And What It Takes To Certify

Share this article

Summary

LEED v5 explained: 110 points across decarbonization, quality of life, and ecological conservation and restoration

This guide covers the LEED v5 impact areas and how the points are weighted, exactly what moved between v4 and v5, the complete v5 scorecard, the three assessments, the Platinum requirements, the registration deadline and what it means for a project choosing a version, and how LEED Zero fits. It closes with a tracker of the projects that have certified under v5 so far, updated with each export of USGBC’s public directory, and a list of the milestones ahead.

LEED v5 in 60 seconds 
StatusCurrent version. Balloted March 2025, launched April 2025
Rating systems availableBD+C, ID+C, O+M. Cities under development. Residential, Neighborhood Development and Communities stay on v4 and v4.1 for now
Points110, same as v4 and v4.1
LevelsCertified 40, Silver 50, Gold 60, Platinum 80
Credit categoriesEight, including a standalone Integrative Process category and Project Priorities in place of Innovation and Regional Priority
Impact areasDecarbonization, Quality of life, Ecological conservation and restoration
Prerequisites, BD+C New Construction16, up from 12 in v4
New in v5Three required assessments, an electrification credit, a peak thermal load credit, and four specific requirements for Platinum
LEED v4 and v4.1 registration closes30 June 2027
LEED v4 and v4.1 certification sunsets30 June 2033
Next versionUSGBC has committed to a five year cycle starting from the 2025 release
Certified so far28 projects in 12 countries as of September 2026, tracked below

If LEED itself is new to you, start with what LEED is and how certification works and come back. This guide assumes the basics and covers only what version 5 changed.

Which LEED v5 impact area is weighted most heavily?

Decarbonization. Of the 110 points available in LEED v5 BD+C New Construction, 73 are attached to credits and prerequisites USGBC links to decarbonization, against 39 for quality of life and 38 for ecological conservation and restoration. Counted as items rather than points, 27 of the 49 credits and prerequisites address decarbonization.

Some sources describe this as a 50/25/25 split. That is close for credits and wrong for points, and the reason is worth understanding.

The three impact areas overlap, so they do not add up to 110: decarbonization 73 points, quality of life 39, ecological conservation and restoration 38
The three impact areas overlap, so they do not add up to 110: decarbonization 73 points, quality of life 39, ecological conservation and restoration 38
Impact areaPoints, BD+C New ConstructionCredits and prerequisites
Decarbonization7327
Quality of life3920
Ecological conservation and restoration3819
Sum of the three15066
Actually available11049

The three columns do not add up to 110 because the impact areas are not three buckets a point falls into. USGBC assigns every credit and prerequisite to one or more impact areas, and many are assigned to two or three. Heat Island Reduction counts toward all three. Compact and Connected Development counts toward all three. Enhanced Water Efficiency counts toward decarbonization and ecological conservation. Add the three lists together and roughly fifty points are counted twice or three times.

So the correct statement is that about half of LEED v5’s credits address decarbonization and that decarbonization touches around two thirds of the available points, not that fifty five points sit in a decarbonization pot. Any table that carves 110 into three exclusive shares is describing a structure the rating system does not have.

USGBC’s own wording for the three, from its LEED v5 page:

Impact areaUSGBC’s description
Decarbonization“targeting reductions in operational, embodied, refrigerants, and transportation emissions”
Quality of life“improving health, well-being, resilience, and equity for building occupants and their communities”
Ecological conservation and restoration“emphasizing strategies that limit environmental degradation and contribute to the restoration of ecosystems”

Quality of life is also where LEED overlaps most with the WELL Building Standard, which certifies the effect of a building on the people inside it and carries its own credential, the WELL AP; teams pursuing both should map the two before documenting either.

A note on the name. These are frequently called the LEED v5 “system goals”, and searching that phrase will find them, but USGBC calls them impact areas throughout the rating system and the reference guides. The third one is also written as “ecosystem conservation and restoration” in places, including once inside USGBC’s own fact sheet, but the official name on the fact sheet title, the diagram and the LEED v5 page is ecological conservation and restoration.

What actually changed from LEED v4 and v4.1?

LEED v5 has the same 110 points and the same four thresholds as v4 and v4.1. Almost everything underneath is different. For how the versions got here, from the 1998 pilot through v2009 and v4, the history of LEED covers the timeline; this guide picks up at v4.1.

The credit categories

Where LEED moved its points between v4 and v5: Materials and Resources gained five points, Indoor Environmental Quality lost three, and Energy and Atmosphere stayed at 33
Where LEED moved its points between v4 and v5: Materials and Resources gained five points, Indoor Environmental Quality lost three, and Energy and Atmosphere stayed at 33
CategoryLEED v4LEED v5Change
Integrative Process, Planning and Assessments11no change in points, three new prerequisites
Location and Transportation1615minus 1
Sustainable Sites1011plus 1
Water Efficiency119minus 2
Energy and Atmosphere3333no change
Materials and Resources1318plus 5
Indoor Environmental Quality1613minus 3
Innovation and Regional Priority, now Project Priorities1010renamed
Total110110 

Both columns are BD+C New Construction. Core and Shell differs: Integrative Process carries 7 points there rather than 1, because Tenant Guidelines becomes a fourth prerequisite and Green Leases adds a 6 point credit.

Two things in that table are worth more than they look.

The first is Materials and Resources gaining five points while Indoor Environmental Quality loses three. Those five points are largely embodied carbon: Reduce Embodied Carbon is a 6 point credit in v5 and Quantify and Assess Embodied Carbon is a new prerequisite. Embodied carbon accounting did not exist in LEED before v5 in any form.

The second is Energy and Atmosphere holding at exactly 33 points, which is the single most misread fact about LEED v5.

Energy and Atmosphere kept all 33 points and spent them differently

Every article about LEED v5 leads with decarbonization. Almost none of them mention that the energy category did not gain a single point. It was 33 in LEED v4 BD+C New Construction and it is 33 in LEED v5.

What changed is where those 33 points sit.

LEED Green Associate, LEED AP BD+C and WELL AP certificates

Become LEED Accredited in 2 weeks

Start for free
Trustpilot Trusted by +7,000 students
Energy and Atmosphere kept all 33 points and spent them differently: the energy modeling credit fell from 18 points to 10 while electrification and peak thermal loads took ten points that did not exist in v4
Energy and Atmosphere kept all 33 points and spent them differently: the energy modeling credit fell from 18 points to 10 while electrification and peak thermal loads took ten points that did not exist in v4
LEED v4 Energy and AtmospherePointsLEED v5 Energy and AtmospherePoints
no equivalent EAp1 Operational Carbon Projection and Decarbonization PlanRequired, new
Minimum Energy PerformanceRequiredEAp2 Minimum Energy EfficiencyRequired
Fundamental Commissioning and VerificationRequiredEAp3 Fundamental CommissioningRequired
Building-Level Energy MeteringRequiredEAp4 Energy Metering and ReportingRequired
Fundamental Refrigerant ManagementRequiredEAp5 Fundamental Refrigerant ManagementRequired
no equivalent EAc1 Electrification5, new
no equivalent EAc2 Reduce Peak Thermal Loads5, new
Optimize Energy Performance18EAc3 Enhanced Energy Efficiency10
Renewable Energy Production3EAc4 Renewable Energy5
Green Power and Carbon Offsets2folded into EAc4 as Tier 3 
Enhanced Commissioning6EAc5 Enhanced Commissioning4
Demand Response2EAc6 Grid Interactive2
Advanced Energy Metering1folded into the EAp4 prerequisite 
Enhanced Refrigerant Management1EAc7 Enhanced Refrigerant Management2
Total33Total33

The headline is in the middle of that table. The energy modeling credit lost eight points. Optimize Energy Performance was worth 18 points in LEED v4, which is 16 percent of the entire rating system and by a wide margin the largest single credit in LEED. Its successor, Enhanced Energy Efficiency, is worth 10, which is 9 percent.

Those eight points, plus two more, went to Electrification and Reduce Peak Thermal Loads, neither of which existed in LEED v4 in any form. LEED v5 did not make energy worth more. It moved the reward from modeling a percentage improvement to not burning fuel on site and to reducing the loads in the first place.

Four other changes inside the category matter in practice:

The baseline standard jumps from ASHRAE 90.1-2010 in v4 to 90.1-2019 in v5, and to 90.1-2022 for any project registering on or after 1 January 2028. That is a nine year jump now and a twelve year jump in 2028, applied to a prerequisite every project must meet.

Fundamental Refrigerant Management in v4 said do not use CFCs. In v5 it requires a complete inventory of refrigerant-containing equipment with global warming potential and quantities, bans hydrochlorofluorocarbons in new equipment, requires the team to evaluate alternatives for anything above 700 GWP, and requires leak checking and repair before substantial completion.

Advanced Energy Metering was an optional point in v4. In v5 that metering sits inside the EAp4 prerequisite, and the project commits to reporting monthly energy data to USGBC annually for five years.

EAp1, the new prerequisite, has USGBC generate a twenty five year business as usual carbon projection for the project from the team’s own submitted energy estimate, and requires the building owner to attest in writing that they have read it. Nothing comparable exists in any earlier version of LEED..

There are four more prerequisites

LEED v4 BD+C New Construction has 12 prerequisites. LEED v5 has 16. Integrative Process went from zero prerequisites to three, Energy and Atmosphere from four to five, and Indoor Environmental Quality from two to three, while Water Efficiency dropped from three to two.

Categoryv4 prerequisitesv5 prerequisites
Integrative Process, Planning and Assessments03
Location and Transportation00
Sustainable Sites11
Water Efficiency32
Energy and Atmosphere45
Materials and Resources22
Indoor Environmental Quality23
Project Priorities00
Total1216

Prerequisites carry no points in either version. They are the floor. Raising the count from 12 to 16 raises the cost of the cheapest possible certification without changing what Certified is worth, which is a quieter but more consequential change than any credit reshuffle.

What is on the LEED v5 scorecard?

The complete LEED v5 BD+C scorecard, New Construction and Core and Shell, from the April 2025 Launch Edition of the reference guide. Sixteen prerequisites and thirty three credits for New Construction.

CodeCredit or prerequisiteNew ConstructionCore and ShellImpact areas
IPIntegrative Process, Planning and Assessments17 
IPp1Climate Resilience AssessmentRequiredRequiredQuality of life
IPp2Human Impact AssessmentRequiredRequiredQuality of life
IPp3Carbon AssessmentRequiredRequiredDecarbonization
IPp4Tenant Guidelines RequiredAll three
IPc1Integrative Design Process11All three
IPc2Green Leases 6All three
LTLocation and Transportation1515 
LTc1Sensitive Land Protection11Ecological
LTc2Equitable Development22Quality of life
LTc3Compact and Connected Development66All three
LTc4Transportation Demand Management44Decarbonization, Quality of life
LTc5Electric Vehicles22Decarbonization
SSSustainable Sites1111 
SSp1Minimized Site DisturbanceRequiredRequiredEcological
SSc1Biodiverse Habitat22Ecological
SSc2Accessible Outdoor Space11Quality of life, Ecological
SSc3Rainwater Management33Ecological
SSc4Enhanced Resilient Site Design22Quality of life, Ecological
SSc5Heat Island Reduction22All three
SSc6Light Pollution Reduction11Ecological
WEWater Efficiency98 
WEp1Water Metering and ReportingRequiredRequiredEcological
WEp2Minimum Water EfficiencyRequiredRequiredDecarbonization, Ecological
WEc1Water Metering and Leak Detection11All three
WEc2Enhanced Water Efficiency87Decarbonization, Ecological
EAEnergy and Atmosphere3327 
EAp1Operational Carbon Projection and Decarbonization PlanRequiredRequiredDecarbonization
EAp2Minimum Energy EfficiencyRequiredRequiredDecarbonization
EAp3Fundamental CommissioningRequiredRequiredDecarbonization
EAp4Energy Metering and ReportingRequiredRequiredDecarbonization
EAp5Fundamental Refrigerant ManagementRequiredRequiredDecarbonization
EAc1Electrification54Decarbonization
EAc2Reduce Peak Thermal Loads55Decarbonization
EAc3Enhanced Energy Efficiency107Decarbonization
EAc4Renewable Energy54Decarbonization
EAc5Enhanced Commissioning43Decarbonization
EAc6Grid Interactive22Decarbonization
EAc7Enhanced Refrigerant Management22Decarbonization
MRMaterials and Resources1821 
MRp1Planning for Zero Waste OperationsRequiredRequiredDecarbonization, Ecological
MRp2Quantify and Assess Embodied CarbonRequiredRequiredDecarbonization
MRc1Building and Materials Reuse35Decarbonization, Ecological
MRc2Reduce Embodied Carbon68Decarbonization
MRc3Low-Emitting Materials21Quality of life
MRc4Building Product Selection and Procurement55All three
MRc5Construction and Demolition Waste Diversion22Decarbonization, Ecological
EQIndoor Environmental Quality1311 
EQp1Construction ManagementRequiredRequiredQuality of life
EQp2Fundamental Air QualityRequiredRequiredQuality of life
EQp3No Smoking or Vehicle IdlingRequiredRequiredQuality of life, Ecological
EQc1Enhanced Air Quality11Quality of life
EQc2Occupant Experience77Quality of life
EQc3Accessibility and Inclusion11Quality of life
EQc4Resilient Spaces22Quality of life
EQc5Air Quality Testing and Monitoring2 Quality of life
PRProject Priorities1010 
PRc1Project Priorities99All three
PRc2LEED AP11All three
 Total110110 

Project Priorities replaces the two categories that closed every earlier scorecard. Innovation and Regional Priority together were 10 points in v4; Project Priorities is 10 points in v5, earned through regional priority credits, project type credits, pilot credits, innovation strategies or exemplary performance, all drawn from USGBC’s project priority library, plus one point for having a LEED AP with a relevant specialty on the team. Legacy LEED APs without a specialty do not qualify for that point.

What are the three new LEED v5 assessments?

The three new assessments are IPp1 Climate Resilience Assessment, IPp2 Human Impact Assessment and IPp3 Carbon Assessment, and all three are prerequisites, so every BD+C project completes them regardless of the level it is targeting. They sit in a category that barely existed before. In LEED v4, Integrative Process was a single optional credit worth one point. In LEED v5 it is a named category, Integrative Process, Planning and Assessments, and its prerequisites come first in the scorecard because they are meant to come first in the project.

CodeNameNew ConstructionCore and ShellImpact area
IPp1Climate Resilience AssessmentRequiredRequiredQuality of life
IPp2Human Impact AssessmentRequiredRequiredQuality of life
IPp3Carbon AssessmentRequiredRequiredDecarbonization
IPp4Tenant Guidelinesnot applicableRequiredall three
IPc1Integrative Design Process1 point1 pointall three
IPc2Green Leasesnot applicable6 pointsall three

IPp1 Climate Resilience Assessment. The project completes a climate and natural hazard assessment and identifies at least two priority hazards from a list that includes drought, extreme heat, extreme cold, flooding, hurricanes and high winds, hail, landslides, sea level rise and storm surge, tornadoes, tsunamis, wildfires and smoke, and winter storms. For each, the team documents the hazard level and risk rating, exposure, sensitivity, adaptive capacity, vulnerability and overall risk, the potential impact on the site and on building function, and the potential impact during construction. The analysis is run against Intergovernmental Panel on Climate Change emissions scenarios with a stated socioeconomic pathway, over the projected service life of the project.

IPp2 Human Impact Assessment. A structured assessment of the project’s social context across four categories: demographics, including ethnicity, gender, age, income, employment rate, density and nearby vulnerable populations; local infrastructure and land use, including transportation, diversity of uses and accessibility codes; human use and health impacts, including housing affordability, availability of social services and community safety; and occupant experience, including daylight, views, operable windows and the environmental conditions of air and water. USGBC publishes a template.

IPp3 Carbon Assessment. This one is widely misunderstood as a fourth separate study. It is not. USGBC runs a twenty five year carbon assessment on the project using data the team is already submitting for other prerequisites: EAp1 Operational Carbon Projection and Decarbonization Plan, EAp5 Fundamental Refrigerant Management, MRp2 Quantify and Assess Embodied Carbon, and optionally LTc4 Transportation Demand Management. The project team’s obligation is to submit the required data for those prerequisites. The assessment itself is generated.

What makes the carbon assessment new is not the paperwork but the scope. Carbon footprint accounting across operational energy, refrigerants, embodied carbon and transportation appears nowhere in LEED v4 or v4.1. Earlier versions rewarded energy efficiency and treated carbon as a consequence of it. LEED v5 measures the carbon directly and projects it forward twenty five years.

What does LEED v5 Platinum require?

LEED v5 Platinum requires 80 points, every prerequisite, and four named achievements: five points in EAc1 Electrification, eight points in EAc3 Enhanced Energy Efficiency, 100 percent of site energy from renewable sources under EAc4, and a 20 percent embodied carbon reduction under MRc2. It is the change with the largest practical consequence and the least coverage.

In every previous version of LEED, the certification levels were pure point thresholds. Meet all prerequisites, earn 80 points by whatever combination of credits suited the project, and the project is Platinum. In LEED v5 BD+C, that is no longer true. Platinum carries four specific requirements printed inside the credits themselves.

RequirementCreditWhat Platinum requires
ElectrificationEAc1Five points, which means no on-site combustion except emergency systems, with combined weighted average heating efficiency of at least 1.8 COP
Energy efficiencyEAc3Eight points of Enhanced Energy Efficiency
Renewable energyEAc4100 percent of site energy from Tier 1, Tier 2 or Tier 3 renewable energy
Embodied carbonMRc2A 20 percent reduction in embodied carbon

USGBC’s own summary of this on the LEED v5 page is a single line: “New requirements for Platinum certification have been created addressing energy efficiency, carbon emissions and renewable energy use.” The specifics are in the credit language in USGBC’s credit library, which is why they rarely appear in explainers.

Read together, they say something clear. A LEED v5 Platinum new building does not burn fossil fuel on site, buys or generates renewable energy equal to all of its site energy use, and has cut its embodied carbon by a fifth. Those are decisions made in early design, not points accumulated late, which is why Platinum in v5 is best treated as a commitment a project makes at the start rather than a total it discovers at the end.

Two qualifications. These four requirements are BD+C requirements; Core and Shell, ID+C and O+M carry their own. And EAc1 matters well below Platinum: EAp1, the prerequisite every project must satisfy, offers a design for electrification path that requires four or five points in EAc1, so electrification is a live question at Certified level too.

LEED v4.1 or LEED v5: which should a project register under?

For most new projects, LEED v5. LEED v4 and v4.1 stay open to new registrations until 30 June 2027, so the choice is real until then, and the case for each is set out below.

The mechanism is simple and the dates have already moved once, so check them rather than trusting any article, this one included.

LEED v4 and LEED v4.1 close to new registrations on 30 June 2027. From 1 July 2027, LEED v5 is the only version available for new registrations of the commercial BD+C, ID+C and O+M rating systems, as USGBC’s LEED v5 help center article states. Projects already registered under v4 or v4.1 have until 30 June 2033 to submit their initial certification application, and projects on a split review get a further 18 months after that date to submit the construction review.

VersionRating systemsRegistration closesCertification sunsets
LEED v4BD+C, ID+C, O+M, O+M Recertification30 June 202730 June 2033
LEED v4.1BD+C, ID+C, O+M, O+M Recertification, O+M Interiors30 June 202730 June 2033
v4 and v4.1Campus or Master Site, new or added to an existing site30 June 202730 June 2033
v4 and v4.1Group, new group project30 June 202730 June 2033
v4 and v4.1Volume, new prototype30 June 202730 June 2033
v4 and v4.1Volume, new project referencing an existing prototype30 June 203030 June 2033

Three things sit outside that table. LEED Zero is unaffected, because it is open to any previously certified project. Residential, Neighborhood Development and Communities are not included, and USGBC has said transition plans for those will follow, so those projects continue on v4 and v4.1. LEED v5 for Cities is under development.

A note on the dates. These deadlines were extended by a full year during 2026. Guidance published before the extension states registration closing 30 June 2026 and certification sunsetting 30 June 2032, with volume prototypes at 30 June 2029. Those dates are superseded, and some of that guidance is still online. If a source gives you 2026 and 2032, it predates the extension. The current table is maintained by USGBC on its LEED certification deadlines page, and it is the only version worth quoting. The extension itself was announced by USGBC.

So which one?

The consultant’s consensus through 2025 was to register under v4.1 while it was still open, on the grounds that the requirements were known, the documentation was familiar and the reviewers had a decade of precedent. That advice has aged.

The case for registering new projects under LEED v5 now is that v5 addresses the issues the market is actually being asked about, carbon and resilience and occupant health, and that a v5 plaque will read as current for years after a v4.1 plaque reads as legacy. A building certified under v4.1 in 2027 carries a certification issued against a 2010 energy standard, in a market where regulators, lenders and tenants are asking carbon questions that v4.1 was never designed to answer. Certification is a long-lived asset. Choosing the older version to make the next eighteen months easier trades away the following ten.

The case for v4.1 is real and worth stating fairly. The requirements are settled, the project team probably already knows them, and there is not yet a certified v5 BD+C project to point at, which means limited accumulated reviewer interpretation and a real chance of being among the first projects to discover what a given credit means in practice. For a project on a tight program, with a team that has never run a carbon assessment, and a client who wants certainty, that is a defensible choice.

The honest summary is that v5 is the better long-term answer for most new projects, and v4.1 is the safer short-term answer for teams who need predictability more than they need currency. What is not defensible is drifting into v4.1 by default because the deadline is still two years away.

For fees, timelines and the mechanics of registration under either version, see LEED certification requirements. For which reference guide to buy, see the LEED reference guide guide; a project still deciding should read that before buying the LEED v4.1 reference guide for a registration that may end up under v5.

On the exam, briefly: the LEED credential exams have their own version timeline, separate from the project rating systems, and it is covered on the LEED exam page rather than here. The LEED Green Associate exam prep and the LEED AP BD+C course are both built on the v5 content in this guide.

Does the 2027 deadline affect LEED Zero?

No. LEED Zero is the one program the registration close does not touch, and it is worth understanding for exactly that reason.

LEED Zero is a separate certification that verifies a building has actually reached a net zero outcome in operation, measured over twelve months of real data rather than predicted at design. There are four categories.

LEED Zero categoryWhat it recognizes
LEED Zero CarbonNet zero carbon emissions over the past year
LEED Zero EnergyA source energy use balance of zero for the past year
LEED Zero WaterA potable water use balance of zero for the past year
LEED Zero WasteGBCI TRUE Zero Waste certification at the Platinum level

Eligibility runs through prior LEED certification rather than through registration, which is why the version deadlines do not apply. USGBC’s eligibility rule is that LEED Zero “is applicable only for whole buildings previously certified under a LEED BD+C, LEED O+M, or Homes rating systems”, and a project does not have to recertify or keep its certification current to pursue it. The building also needs average occupancy of 50 percent or more across the twelve month reporting period.

The practical reading for a project team is that LEED Zero remains open indefinitely to any building that has ever been LEED certified, under any version, including v4 and v4.1 projects certified long after v5 becomes the only route for new registrations. It sits on top of a certification rather than replacing one.

It is also the clearest expression of where LEED v5 is heading. LEED v5 moved the rating system toward measured carbon outcomes, EAp1 projects a building’s emissions twenty five years forward, and LEED Zero certifies against twelve months of what actually happened. A team pursuing v5 with a serious decarbonization plan is already assembling most of what LEED Zero asks for.

How are the first LEED v5 projects certifying?

Twenty-eight projects had certified under LEED v5 by September 2026, in twelve countries, seventeen months after the rating system launched. They are the projects that chose to go first, which is the right way to read everything below: a first cohort, self-selected for commitment, and the projects everyone registering later will learn from. USGBC’s public project directory, filtered to LEED v5 and to certified projects, is the complete record, and it is the source for all of this.

The first wave is existing buildings

The first wave of LEED v5 certifications is existing buildings: 26 of the first 28 certified projects are O+M and two are ID+C, with the first BD+C certifications expected between 2027 and 2029
The first wave of LEED v5 certifications is existing buildings: 26 of the first 28 certified projects are O+M and two are ID+C, with the first BD+C certifications expected between 2027 and 2029
Rating systemCertified LEED v5 projects, September 2026
Operations and Maintenance (O+M)26
Interior Design and Construction (ID+C)2
Building Design and Construction (BD+C)0, first certifications expected 2027 to 2029

This is exactly the sequence the calendar predicts. USGBC opened LEED v5 O+M to an early adopter group ahead of the general launch, and the earliest certifications, from October 2024, are that cohort. An existing building can be assessed against an operations standard and certified within months. A new building has to be designed, permitted, built and occupied before it can certify, which under LEED has historically taken two to four years from registration. LEED v5 BD+C launched in April 2025, so the first certified v5 new buildings are due somewhere between 2027 and 2029, and that milestone is tracked below.

It also means the first cohort is doing the work an operations standard exists to do: proving in occupied, running buildings that the v5 requirements can be met and measured. Two of those buildings are among the most recognized in the world. The Empire State Building certified LEED v5 Platinum in October 2025 at 82 points, and Taipei 101 in June 2025 at 95. International Commerce Centre in Kowloon reached 91. Landmarks choosing a new rating system in its first year is the strongest endorsement a version can get.

They set a level and hit it

The first LEED v5 projects set a level and hit it: every certified project by points achieved, with 23 of 28 certifying within five points of the threshold they targeted
The first LEED v5 projects set a level and hit it: every certified project by points achieved, with 23 of 28 certifying within five points of the threshold they targeted
Points achievedProjectsLevel
401Certified
50 to 543Silver
61 to 649Gold
80 to 9615Platinum

Fifteen of the first twenty-eight are Platinum, nine are Gold, three Silver and one Certified. The median score is 80 and the range runs from 40 to 96.

The pattern worth noticing is how precisely the cohort landed. Every Gold project sits between 61 and 64 points. Every Platinum sits at 80 or above. Twenty-three of the twenty-eight certified within five points of the threshold they were aiming at, and no project scored between 65 and 79. That is a cohort that set a target early and delivered it with very little effort spent above the line, which is what disciplined LEED management looks like.

It also fits how v5 is built. Platinum in v5 rests on decisions made at the start of a project, so teams tend to know early which side of 80 they are on, and the ones that are not pursuing Platinum bank a strong Gold rather than chasing points that would not change their level.

Two caveats for anyone reading these figures as a benchmark. Twenty-eight is a first cohort, and a Platinum share above fifty percent reflects who chose to go first rather than what a typical building will achieve once thousands have certified. And because the cohort is existing buildings and interiors, it describes the O+M and ID+C rating systems, not BD+C.

Twelve countries in the first seventeen months

LEED v5 certified projects in twelve countries within seventeen months: United States 11, China 4, Mexico 2, Italy 2, India 2, and one each in seven other countries
LEED v5 certified projects in twelve countries within seventeen months: United States 11, China 4, Mexico 2, Italy 2, India 2, and one each in seven other countries
Country, as the directory lists itCertified projects
United States11
China4
Mexico2
Italy2
India2
Brazil1
Canada1
Israel1
Romania1
Spain1
Sweden1
Taiwan, China1

Seventeen of the twenty-eight are outside the United States. For a rating system in its first year and a half, that is a wide footprint, and it includes the highest score in the world so far: 96 points for an 803 square meter project in Madrid, which says something about what a small project with a single decision maker can do under v5.

When they certified

LEED v5 certifications by quarter: five in 2024, twenty in 2025 and three in 2026 through July
LEED v5 certifications by quarter: five in 2024, twenty in 2025 and three in 2026 through July
PeriodCertifications
2024 Q45
2025 Q13
2025 Q28
2025 Q35
2025 Q44
2026 Q10
2026 Q22
2026 Q3, to 1 July1

Eight of the twenty-eight carry certification dates before the April 2025 launch. That is not a data error. They are USGBC’s LEED v5 O+M early adopters, featured on USGBC’s own LEED v5 page, and the earliest, from October 2024, is Portobello Shop Jardim Social in Curitiba at 84 points. The quarterly figures beyond that describe a first cohort clearing, with the BD+C pipeline registered in 2025 and 2026 still working toward its first certifications.

The full list, September 2026

ProjectCityCountryPointsLevelCertified
Fernandez Molina, Apolonio Morales 29MadridSpain96Platinum2025-08-08
Taipei 101Taipei CityChina95Platinum2025-06-11
International Commerce CentreKowloonChina91Platinum2025-03-07
Hung Kuo BuildingSongshan DistrictTaiwan, China90Platinum2025-05-08
Kvarngardet 1:19 TornetUppsalaSweden87Platinum2025-07-03
Infosys E City Phase 1 SEZ CrescentBangaloreIndia85Platinum2025-06-13
Gianni Giorgi AlbertiRomeItaly84Platinum2025-05-13
Portobello Shop Jardim SocialCuritibaBrazil84Platinum2024-10-08
DXC TowerTaipei CityChina84Platinum2025-07-17
FSFTQ Edifice Louis-LabergeMontrealCanada83Platinum2025-06-06
Empire State BuildingNew YorkUnited States82Platinum2025-10-24
Sarona TowerTel AvivIsrael81Platinum2025-05-14
BranchPattern OmahaOmahaUnited States81Platinum2025-01-29
Torre DianaDistrito FederalMexico80Platinum2024-10-16
DLF Cyber ParkGurugramIndia80Platinum2025-10-08
Tlalnepark IV Nave 2 AxoTlalnepantlaMexico64Gold2024-12-04
Saint Laurent Beijing SanlitunBeijingChina64Gold2026-07-01
One Bush StreetSan FranciscoUnited States64Gold2025-02-01
City Gate South TowerBucharestRomania64Gold2025-09-25
Group14 Engineering PBCDenverUnited States63Gold2026-05-08
Chiesi Farmaceutici R&D CentreParmaItaly63Gold2025-10-25
Levi’s Plaza Koshland BuildingSan FranciscoUnited States62Gold2025-09-12
Monona Terrace 2026MadisonUnited States61Gold2025-05-28
Xfinity Mobile ArenaPhiladelphiaUnited States61Gold2025-05-30
Ascent MKEMilwaukeeUnited States54Silver2024-11-08
Citigroup CenterMiamiUnited States53Silver2024-12-06
1201 Pennsylvania AvenueWashingtonUnited States50Silver2026-04-27
Penn 1New YorkUnited States40Certified2025-10-21

Median floor area 363,000 square feet, with projects ranging from under 6,000 square feet to over three million. Floor area and points achieved are effectively uncorrelated across the cohort, so size is not what drives the score under v5.

What to watch in LEED v5

MilestoneWhenWhat changes
First certified LEED v5 BD+C projectExpected 2027 to 2029The tracker gains its first new building, and the Platinum requirements get their first real test
LEED v4 and v4.1 registration close30 June 2027The version choice section becomes history and v5 is the only route
ASHRAE 90.1-2022 becomes the v5 baselineRegistrations on or after 1 January 2028EAp2, EAp3 and EAp4 all step up for every new registration
LEED v4 and v4.1 certification sunset30 June 2033The last v4.1 projects certify; split reviews run to the end of 2034
Next version of LEEDAround 2030 on USGBC’s five year cycleLEED v5 becomes the version being transitioned from

Frequently asked questions

Is LEED v5 released?

Yes. LEED v5 was balloted by USGBC members in March 2025 and launched in April 2025. It is the current version for BD+C, ID+C and O+M, and registration and certification run through the Arc platform.

When does LEED v5 go into effect?

It is already in effect. LEED v5 has been available for registration since 2025. The date that matters for planning is 1 July 2027, when it becomes the only version available for new commercial registrations.

When will LEED v5 be required?

For new registrations of commercial BD+C, ID+C and O+M projects, 1 July 2027. LEED v4 and v4.1 close to new registrations on 30 June 2027

Is LEED v4 still available?

Yes, until 30 June 2027 for new registrations. After that date it closes to new projects, and already registered v4 and v4.1 projects have until 30 June 2033 to submit for certification.

Is LEED v4 still valid?

Yes. A LEED v4 or v4.1 certification does not expire because a newer version exists, and projects registered before the close date can certify under v4 or v4.1 right through to 2033.

What is the LEED v5 sunset date?

LEED v5 has no sunset date. The sunset dates being discussed belong to LEED v4 and v4.1, both of which sunset for certification on 30 June 2033.

What is the difference between LEED v4 and LEED v5?

Same 110 points and same four levels, different structure. LEED v5 adds three required assessments under a standalone Integrative Process category, adds four prerequisites overall, moves Innovation and Regional Priority into Project Priorities, gives Materials and Resources five more points for embodied carbon, and rebuilds Energy and Atmosphere around electrification and peak load reduction while keeping its 33 point total. It also attaches four specific requirements to Platinum.

Which of the LEED v5 system goals is weighted most heavily?

Decarbonization. It is attached to 73 of the 110 points in BD+C New Construction and to 27 of the 49 credits and prerequisites, against 39 points for quality of life and 38 for ecological conservation and restoration. The three overlap, because a single credit can be assigned to more than one impact area.

What are the three LEED v5 impact areas?

Decarbonization, quality of life, and ecological conservation and restoration. They are often called the LEED v5 system goals, but USGBC calls them impact areas.

How many points is LEED v5?

110 for BD+C New Construction and Core and Shell, across eight categories: Integrative Process 1, Location and Transportation 15, Sustainable Sites 11, Water Efficiency 9, Energy and Atmosphere 33, Materials and Resources 18, Indoor Environmental Quality 13 and Project Priorities 10. Certified starts at 40, Silver at 50, Gold at 60 and Platinum at 80.

What is LEED Zero?

A separate certification verifying a net zero outcome measured over twelve months of operating data, in four categories: Zero Carbon, Zero Energy, Zero Water and Zero Waste. The building must already hold a LEED certification and must have averaged 50 percent occupancy or more across the reporting period.